How the process runs

In the order it normally happens. Your result at step two decides which form is filed.

  1. Survey and samples

    An accredited inspector looks at the materials that may contain asbestos, such as siding, floor tile and pipe wrap, and takes samples for an accredited lab.

  2. The result sets the form

    If the lab finds regulated asbestos-containing material (RACM), AAC-2a applies. If it finds none, or amounts below the thresholds, the AAC-2b negative declaration is used, backed by the lab analysis.

  3. Removal, if needed

    A licensed abatement contractor removes the regulated material first, working in a sealed area in protective suits and respirators, before any machine touches the building.

  4. Notification to LDEQ

    The form goes to LDEQ's Notifications & Accreditations section ahead of the start date. Check the current form for the lead time and any fee.

  5. Disposal paperwork

    AAC-2a is also the form used to request asbestos disposal verification forms, so the removed material is accounted for.

  6. Demolition or renovation

    Only then does the demolition or renovation crew start.

When owners need it

  • Before any teardown of an older house or building, since LDEQ expects a notification ahead of a demolition.
  • Before a gut-out or remodel: AAC-2a covers demolition or renovation with regulated asbestos-containing material.
  • A storm-damaged building. Damage does not remove the survey or the form.
  • Landlords, property managers and developers pricing a job who want the asbestos question answered before the demolition quote.
An excavator pulling apart a wood-frame house while a worker in a safety vest stands by
A frame house coming down in Louisiana, 2006
Excavator arm pulling down the side of a two-story wood building

Who and what is involved

Several trades touch an asbestos job. Ask each contractor which of these their quote covers.

LDEQ asbestos notices

AAC-2a: regulated material present

The notification for a demolition or renovation involving regulated asbestos-containing material (RACM). It is also used to request asbestos disposal verification forms.

AAC-2b: negative declaration

Used when no RACM is present or amounts are below the thresholds. It requires an accredited lab analysis.

Timing, fees and emergencies

The lead time and any fee are set on the current form, so read it before you set a start date. The emergency notice is limited to sudden, unsafe events. Forms and contacts are on the LDEQ asbestos page.

What to prepare

None of this is needed to ask for quotes. All of it makes the quotes sharper.

Asbestos questions

Do I need an asbestos survey before demolishing a building in Lake Charles?

LDEQ expects a notification before a demolition, and the building has to be inspected and sampled first so the right form can be filed. If regulated material is present it must be dealt with before the building comes down.

What is the difference between AAC-2a and AAC-2b?

AAC-2a is for a demolition or renovation where regulated asbestos-containing material is present. AAC-2b is the negative declaration, used when no regulated material is present or amounts are below the thresholds, and it requires an accredited lab analysis.

How far ahead does the form have to be filed?

The lead time and any fee are set on the current LDEQ form, so read it before you set a start date. Ask each contractor whether they file the form or expect you to.

Does the form apply to a renovation, not just a teardown?

Yes. AAC-2a covers demolition or renovation involving regulated asbestos-containing material, so a gut-out or remodel of an older building can need it.

What does asbestos work cost in Lake Charles?

We have no reliable local price range, so none is published here. The cost depends on what the survey finds, which only an inspection shows. Ask contractors to price the survey and any removal as separate lines.

Does Lake Charles Demolition do the survey or the removal?

No. Lake Charles Demolition is a quote-request service. We pass your request to independent local contractors, who quote you directly and work under their own license and insurance.

Get asbestos quotes

Tell us about the building. We pass your request to independent local demolition contractors, who contact you directly with their own quotes. Free, with no obligation to hire anyone.

Asbestos is usually quoted with the work that follows it. See every town we take requests from on the service areas page.